Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

22626 SBC-MAS Double Decker - எப்பவுமே டாப் டக்கர் - Vijay Baradwaj

Search Forum
<<prev entry    next entry>>
Blog Entry# 1919968
Posted: Jul 06 2016 (16:05)

4 Responses
Last Response: Jul 06 2016 (16:58)
Rail News
3320 views
1

Other News
SECR/South East Central
Jul 06 2016 (14:28)   2 माह तक नहीं खत्म होगा मेगा ब्लॉक, यात्री कहीं जाने से पहले जरुर पढ़ें
 

ankurgupta0602~   4691 news posts
Entry# 1919968   News Entry# 272979         Tags   Past Edits
रायपुर-बिलासपुर रेलवे लाइन पर ट्रेनों की स्पीड बढ़ाने को लेकर रेलवे को खासी मशक्कत करनी पड़ रही है। See more at: click here

2864 views
0

Jul 06 2016 (16:05)
I.R.needrejuvenation~
I.R.needrejuvenation~   1946 blog posts
Re# 1919968-1              
Problem is capacity creation in our rlys lag very much behind the demand. BSP-Raipur-Durg double line has saturated long back and trebling which is about to be completed now, took over 20 years . By the time trebling is over to ease saturated double line, traffic is demanding fourth track which is rightly being taken up, thanks to the policy of capacity creation being followed by honorable RM PrabhuJi.
How there can be proper maintenance of super saturated predominantly freight (High Earning) line when Rlys is facing financial crunch! Such long mega blocks are unwanted compulsion if speed worthiness (mps) of the track is to be improved.
In
...
more...
fact I was surprised when Bilaspur – Nagpur (a section under SECR Railway) was selected amongst the 9 routes for operation of semi high speed trains. This is a neglected section as far as speed is concerned. In spite of being trunk line with Durontos and Rajdhani running on it, MPS was till recently 105kmph only (due to heavy freight traffic), whereas on most of trunk lines mps is 130kmph. Even in many “B” sections Mps is 110kmph. Running trains at 160 kmph (up to 200kmph in future) shall demand many improvements due to heavy freight traffic and especially in hilly Dongargarh region due to curves. It is learnt that the third track shall be used for operating the proposed Semi High Speed train to the extent possible.
Co-existence of (Semi) High Speed Train and a lots of goods trains on same track is a difficult proposition. Tracks bearing the brunt of heavy freight trains are ill prepared to take the run of High Speed Express trains which demand strict track tolerances. Most of the trunk lines (Golden Quadrilateral+ diagonals) are having moderately high to very high freight traffic (esp in eastern region), We eagerly are waiting for completion of Dedicated Freight Corridors before Safe (Semi) High Speed trains proliferate on our tracks.

Translate to English
Translate to Hindi

2815 views
2

Jul 06 2016 (16:27)
Sitanshu   72 blog posts
Re# 1919968-2              
Der aye durust aye
Translate to English
Translate to Hindi

2737 views
1

Jul 06 2016 (16:50)
Railadventures~
Railadventures~   2771 blog posts
Re# 1919968-3              
Acchi train chalani hai to speed to badhani hi hogi traino ki
Translate to English
Translate to Hindi

3183 views
0

Jul 06 2016 (16:58)
tan.11~
tan.11~   2019 blog posts
Re# 1919968-4              
And we can expect a Gatimaan operating between NGP-BSP.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy