Search Forum
Blog Entry# 1937817
Posted: Jul 22 2016 (15:18)
4 Responses
Last Response: Jul 22 2016 (17:15)
4 Responses
Last Response: Jul 22 2016 (17:15)
New Facilities/Technology
WR/Western
I.R.needrejuvenation~ 949 news posts
Encouraged by the success of China in developing a vast high speed rail network, which is now the largest in the world, the Indian Railway is...
1 Public Posts - Fri Jul 22, 2016
Firstly the current operating speed of Rajdhanis is 130/140 kmph and 75-85 kmph is average speed. Even if the speed is increased to 200kmph through improvement in track and rake, the average speed shall practically be 120-125kmph.
500km Mumbai-Ahmedabad Bullet train project is costing 1 lac crore Rs. Quadrilateral (i.e. interconnection of 4 metros) shall involve construction of about 10000 kms of track shall cost upward of 20lac crore Rs., which leave aside Indian Railways, even the Indian Economy can not bear.
The Mum-Ahm project has become possible due to extremely...
more...
500km Mumbai-Ahmedabad Bullet train project is costing 1 lac crore Rs. Quadrilateral (i.e. interconnection of 4 metros) shall involve construction of about 10000 kms of track shall cost upward of 20lac crore Rs., which leave aside Indian Railways, even the Indian Economy can not bear.
The Mum-Ahm project has become possible due to extremely...
more...
2 Public Posts - Fri Jul 22, 2016