Blog Entry# 1946313
Posted: Jul 30 2016 (19:35)
14 Responses
Last Response: Sep 02 2016 (17:56)
14 Responses
Last Response: Sep 02 2016 (17:56)
DRM SPJ Tweeted
LNO-JJP खण्ड के मध्य ब्रिज सं-88 पर अत्यधिक दबाव के कारण सुरक्षा के दृष्टिकोण से गाड़ियों के परिचालन को बन्द किया गया
The under construction bridge on right side is more than 10 years old because even after 4 failed attempts one pillar is still uncompleted and no one knows when they will be able to do it.
LNO-JJP खण्ड के मध्य ब्रिज सं-88 पर अत्यधिक दबाव के कारण सुरक्षा के दृष्टिकोण से गाड़ियों के परिचालन को बन्द किया गया
The under construction bridge on right side is more than 10 years old because even after 4 failed attempts one pillar is still uncompleted and no one knows when they will be able to do it.
9 Posts
anyway sadly, looks like Railway is not looking for GC of this section for at least 4-5 years :-( .
btw ECR claming that they will make kosi bridge operational by March 18, not sure without fixing this bridge how will they do it.
SKI-Ghogardiha MG,
Ghogardiha-NMA xxx
NMA-Forbesgunj BG
and if luck supports then SKI(DBG)-NMA_Forbesgunj BG.
Ghogardiha-NMA xxx
NMA-Forbesgunj BG
and if luck supports then SKI(DBG)-NMA_Forbesgunj BG.
DRM SPJ has tweeted that GGH JJP may close for GC from September 15, 2016