Search Forum
Blog Entry# 1969377
Posted: Aug 22 2016 (00:55)
16 Responses
Last Response: Aug 27 2016 (23:55)
16 Responses
Last Response: Aug 27 2016 (23:55)
9 Public Posts - Sat Aug 27, 2016
1) Overspeeding.Track upgradation of all zones in which your train runs takes many years.Not possible in near future.
2) Bypassing VSKP is not a good idea
3)Reduce 3-tier AC to 4-5 and increase Sleepers.2 GN are enough
4) Unrealistic and non existing loco links
2) Bypassing VSKP is not a good idea
3)Reduce 3-tier AC to 4-5 and increase Sleepers.2 GN are enough
4) Unrealistic and non existing loco links
6 Public Posts - Sat Aug 27, 2016