Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

संपूर्ण क्रान्ति है तो जहां है

Search Forum
<<prev entry    next entry>>
Blog Entry# 1982285
Posted: Sep 05 2016 (21:46)

10 Responses
Last Response: Sep 20 2016 (21:55)
Site-Related
4493 views
4

Sep 05 2016 (21:46)  
 
TheDarkLord~
TheDarkLord~   10265 blog posts
Entry# 1982285              
#moderator Sir, Why the atlas of this prestigious site is showing wrong informations. Routes which are non-electrified and even don't have any official notification regarding the latest status of electrification are being shown as BG Electrified in the Atlas. Take the example of BJU-KIR and KIUL-BGP route. Neither of them are electrified but Altas is showing some different story (see the attached SS). Wrong updates can hamper the credibility of this site so it's my suggestion that Atlas should only be updated after the CRS inspection and approval of any route.
Translate to English
Translate to Hindi

6 Posts

1825 views
0

Sep 10 2016 (13:38)
TheDarkLord~
TheDarkLord~   10265 blog posts
Re# 1982285-7              
#moderator Still waiting for ur corrective measure. Dubious informations should not not be updated.
Translate to English
Translate to Hindi

1741 views
1

Sep 12 2016 (16:17)
TheDarkLord~
TheDarkLord~   10265 blog posts
Re# 1982285-9              
Thanks to the #moderator for rectifying erred updates in the Atlas of this Website. Request to the Atlas monitors to not update fault updates without cross checking the fact.
Translate to English
Translate to Hindi

1420 views
0

Sep 17 2016 (21:11)
kuttpura~
kuttpura~   918 blog posts
Re# 1982285-10              
waapas katihar tak electrify kar diya kisi ne. log apne shauk ke liye galat info update kar rhe hain. whoever is responsible should be stripped of the responsibility
Translate to English
Translate to Hindi

1574 views
0

Sep 20 2016 (21:55)
TheDarkLord~
TheDarkLord~   10265 blog posts
Re# 1982285-11              
#moderator Sir, once again wrong information updated after the correction done by you earlier. BJU-KIR is not electrified yet, neither the CRS inspection done nor tentative date released for that and still work is going on but the Atlas of our Site is showing this as completely electrified. Why the Atlas monitors are time and again repeating the same mistake by updating erred information. Plz. see this.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy