Search Forum
Blog Entry# 1987979
Posted: Sep 11 2016 (10:41)
11 Responses
Last Response: Sep 20 2016 (07:05)
11 Responses
Last Response: Sep 20 2016 (07:05)
Sep 11 2016 (10:41) IMG09158-886143/♥♥Nagpur Patna SuperFast Exp♥♥
3313 net green flags 21 green per TrainCustom Ratings
![](http://st.indiarailinfo.com/images/1.png)
Chetan~
Chetan~ 155 img trains 152 popular3313 net green flags 21 green per TrainCustom Ratings
1 Public Posts - Sun Sep 11, 2016
Very practical and required train. Introduction of this train and complementary train (departing from JBP in morning)is a strong possibility after completion of Gondia-Jabalpur GC project.
Considering the stoppages given, too much time has been allotted to this train. Durg-G should be 1hr 55 min instead of 2hr 35minutes like other trains on the route. Even with this reduction in running time, the arrival time at JBP should be 13:40. The same rake can return back departing JBP at 14:40 and arriving Raipur at around 22:20hrs.
Nothing can be about speed...
more...
Considering the stoppages given, too much time has been allotted to this train. Durg-G should be 1hr 55 min instead of 2hr 35minutes like other trains on the route. Even with this reduction in running time, the arrival time at JBP should be 13:40. The same rake can return back departing JBP at 14:40 and arriving Raipur at around 22:20hrs.
Nothing can be about speed...
more...
1 Public Posts - Mon Sep 12, 2016
7 Public Posts - Tue Sep 13, 2016
1 Public Posts - Tue Sep 20, 2016