Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

The purest enjoyment of life - be a RailFan.

Search Forum
<<prev entry    next entry>>
Blog Entry# 1988154
Posted: Sep 11 2016 (12:45)

58 Responses
Last Response: Sep 12 2016 (09:14)
Rail News
12322 views
4

Sep 11 2016 (12:22)   Talgo completes DELHI MUMBAI journey in less than 12 hours
 

Railfan_bihari   28 news posts
Entry# 1988154   News Entry# 279713         Tags   Past Edits
Talgo completes DELHI MUMBAI journey in less than 12 hours

44 Public Posts - Sun Sep 11, 2016

1392 views
10

Sep 11 2016 (21:26)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 1988154-45              
There are two problems that trains face at curves. One is the problem of enough centripetal force, that is tackled by having a tilted track at curves. This is something that even a single coach traveling alone will face at curves.
But there is another problem that pops up only when the are multiple coaches involved. Normally, when a train is running, each coach experiences two forces through its couplers. One is a forward pulling force by the coaches in front, the other is a backward pulling force by the rear coaches. When the loco generates enough traction, the forward force dominates and the train moves forward.
...
more...
On straight tracks, these forces are aligned with the tracks and the direction of motion of the train, so they do not cause any lateral forces. But on curves, the shell of the coach remains in a straight line, while the bogies rotate and follow the curve. So these forces are no longer in a straight line and effectively it results in a lateral force that pulls the coach towards the inner edge of the curve. ( I highlighted this in the rather poorly drawn diagram with the red arrow as the effective force).
The longer the coach is, the more this force will be and to meet high speed requirements, the curve has to be made less sharp. This is why LHB coaches will need a lot of track upgrades to be able to run at higher speeds with long rakes.
Talgo on the other hand, uses a Jacobs bogie arrangement and several innovative facilities that reduce the impact due to this force on curves and hence, can hit higher speed on curves even with longer rakes.
The locomotive is not a factor in this problem and as long as it can hit the necessary speed, it is enough.

Translate to English
Translate to Hindi

11 Public Posts - Sun Sep 11, 2016

2 Public Posts - Mon Sep 12, 2016
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy