Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Kolkata Local - আমি তোমাকে ভালবাসি

Search Forum
<<prev entry    next entry>>
Blog Entry# 1997516
Posted: Sep 20 2016 (23:10)

6 Responses
Last Response: Sep 23 2016 (10:42)
Poll
4922 views
41 votes
0

Sep 20 2016 (23:10)  
 
MAREECH_HA1NKS~
MAREECH_HA1NKS~   2310 blog posts
Entry# 1997516              
WILL INDIAN RAILWAYS REALLY NEED A BULLET & TALGO TRAINS OR CHOOSE FOLLOWING OPTIONS GIVEN BELOW.PLZ VOTE
THANKS.
Translate to English
Translate to Hindi
NO vote
YES. we want this type of train
15%
6
No Need of this type of trains in Indian Railways
7%
3
No we need to make our rail infra structure better
73%
30
Any other reason you would like to include here.
5%
2

1 Posts

2481 views
0

Sep 22 2016 (19:57)
madanmohanmeena^~
madanmohanmeena^~   15467 blog posts
Re# 1997516-2              
Talgo and bullet are two different thing.
IR need to introduce large number of Talgo in india bcz it consume less electicity and can run at high speed.
Translate to English
Translate to Hindi

2451 views
0

Sep 22 2016 (22:03)
MAREECH_HA1NKS~
MAREECH_HA1NKS~   2310 blog posts
Re# 1997516-3              
But TALGO is not fit for Indian Conditions.
Translate to English
Translate to Hindi

2565 views
1

Sep 22 2016 (22:30)
MAREECH_HA1NKS~
MAREECH_HA1NKS~   2310 blog posts
Re# 1997516-4              
Yes But I want To include more things in your blog that Ir need to do something related to tracks Consider Jharsugda Bilaspur That route is now going towards quadcrupling But the section between Rajnandgaon ITWARI is not ready for third line, yesterday one passenger tweeted to Drm BSP that our train was stationed for 20 minutes due to passing given to the freight train in katni aunpur section .And even those delayed projects by IR Like Gondia Jabalpur rlwy Spented 20 years and money but still not completed and if this route were exist at that time when ET incident occurs so Ir was able to minimise the loss not completely but upto some extent.And ir should complete those delayed projects as early as possible .And our tracks are able to handle 160 but we need to maintain the tracks and convert those tracks for 160...
more...
KM/H those unfit for high speed like this .Because we need to proceed one by one for everything. We want Bullet or other High speed trains but at first we need BETTER MANAGED RAILWAY,Like your screen Name.

Translate to English
Translate to Hindi

2445 views
0

Sep 22 2016 (23:56)
I.R.needrejuvenation~
I.R.needrejuvenation~   1946 blog posts
Re# 1997516-5              
SECR is predominantly freight traffic with no. of freight trains being twice the number of passenger trains.
Freight traffic on BSP-DURG, & BSP-JSG is higher than Durg-NGP due to Heavy coal traffic from SECL ( Korba, Chirimiri region) Bhilai Steel Plant and many other Power plants/ large industries. So tripling started about 2 decades back which, quite slowly, is almost at the verge of completion. Anuppur-KTE, BSP-Anuppur have heavy coal traffic but poor terrain limits its sectional capacity. Durg-RJN tripling is going on at leisurely place since about 3 years. RJN-NGP tripling project is being taken up. I have stressed earlier that SECR had received ridiculously low investments in spite of being the most profitable zone with OR of about
...
more...
50. Little funds were allocated to highly profitable SECR capacity augmentation projects and many a times they too were diverted to loss making projects of some VIP area.
Earlier the allocations had been on the basis of the political dispensation of IR, with area of RM getting lions share and rest was shared between remaining states roughly in proportion to the weightage/activism of respective PRs. There was a time when very high amounts almost 50% of total new lines of IR were allocated to Kolkata Metro which had a negative rate of return (OR about 250-300) but not today. Financial consideration no where in picture.
With Mr. prabhu as RM, he has delegated most of financial powers of RM to Rly officials esp. GMs & DRMs. The power of Officials have increased like never before. If politicisation has decreased with reduced interference of RM, there is another old problem in IR which is likely to increase if not checked, i.e. departmentalism. Now Rly officials with typical Head Qtr orientation being more powerful, the favor may shift more to places of Rly officials (i.e. divisional & zonal HQs) which find favour by new trains, more reservation quota, better stations, & other facilities. HQs may find more favor than before in project proposal too. One thing is evident that in last couple of years, SECR is pressing more to develop KTE-BSP-JSG route over JSG-BSP-NGP route in spite of the fact that the terrain of BSP-KTE is mountainous and train operation shall be costlier than flat BSP-NGP section. In other words there are chances that zones may work with more focus on zonal interest rather in national interest.
New lines/trains, doublings etc BSP-JSG tripling is going on. Even before tripling is completed, the SECR is pressing for quadrupling rather than tripling of Durg-NGP is a bit surprising esp. when SHS train is proposed on BSP-NGP. And for BSP-Durg section SECR officials plan to develop & use third line for 160 kmph train.

Translate to English
Translate to Hindi

2426 views
0

Sep 23 2016 (10:42)
I.R.needrejuvenation~
I.R.needrejuvenation~   1946 blog posts
Re# 1997516-6              
We can say that trials of existing Talgo coaches (9 coach of 13 M length) were successful.
These coaches/rake have to be adopted to Indian conditions i.e. dimensions, foot board height, and longer train i.e. about 550m length instead of about 140m length of trial rake. (i.e. with much higher number of coaches and/or longer coaches).
But this Indianised Talgo rake will be successful or not we can not say with certainty. If sech Indianised rake could give similar results to that of the present one, then it is fit for
...
more...
India.
So we cannot say with certainity that it is fit or unfit for Indian conditions.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy