WILL INDIAN RAILWAYS REALLY NEED A BULLET & TALGO TRAINS OR CHOOSE FOLLOWING OPTIONS GIVEN BELOW.PLZ VOTE
THANKS.
THANKS.
NO vote
YES. we want this type of train
15%
6
No Need of this type of trains in Indian Railways
7%
3
No we need to make our rail infra structure better
73%
30
Any other reason you would like to include here.
5%
2
1 Posts
Talgo and bullet are two different thing.
IR need to introduce large number of Talgo in india bcz it consume less electicity and can run at high speed.
IR need to introduce large number of Talgo in india bcz it consume less electicity and can run at high speed.
Yes But I want To include more things in your blog that Ir need to do something related to tracks Consider Jharsugda Bilaspur That route is now going towards quadcrupling But the section between Rajnandgaon ITWARI is not ready for third line, yesterday one passenger tweeted to Drm BSP that our train was stationed for 20 minutes due to passing given to the freight train in katni aunpur section .And even those delayed projects by IR Like Gondia Jabalpur rlwy Spented 20 years and money but still not completed and if this route were exist at that time when ET incident occurs so Ir was able to minimise the loss not completely but upto some extent.And ir should complete those delayed projects as early as possible .And our tracks are able to handle 160 but we need to maintain the tracks and convert those tracks for 160...
more...
more...
SECR is predominantly freight traffic with no. of freight trains being twice the number of passenger trains.
Freight traffic on BSP-DURG, & BSP-JSG is higher than Durg-NGP due to Heavy coal traffic from SECL ( Korba, Chirimiri region) Bhilai Steel Plant and many other Power plants/ large industries. So tripling started about 2 decades back which, quite slowly, is almost at the verge of completion. Anuppur-KTE, BSP-Anuppur have heavy coal traffic but poor terrain limits its sectional capacity. Durg-RJN tripling is going on at leisurely place since about 3 years. RJN-NGP tripling project is being taken up. I have stressed earlier that SECR had received ridiculously low investments in spite of being the most profitable zone with OR of about...
more...
Freight traffic on BSP-DURG, & BSP-JSG is higher than Durg-NGP due to Heavy coal traffic from SECL ( Korba, Chirimiri region) Bhilai Steel Plant and many other Power plants/ large industries. So tripling started about 2 decades back which, quite slowly, is almost at the verge of completion. Anuppur-KTE, BSP-Anuppur have heavy coal traffic but poor terrain limits its sectional capacity. Durg-RJN tripling is going on at leisurely place since about 3 years. RJN-NGP tripling project is being taken up. I have stressed earlier that SECR had received ridiculously low investments in spite of being the most profitable zone with OR of about...
more...
We can say that trials of existing Talgo coaches (9 coach of 13 M length) were successful.
These coaches/rake have to be adopted to Indian conditions i.e. dimensions, foot board height, and longer train i.e. about 550m length instead of about 140m length of trial rake. (i.e. with much higher number of coaches and/or longer coaches).
But this Indianised Talgo rake will be successful or not we can not say with certainty. If sech Indianised rake could give similar results to that of the present one, then it is fit for...
more...
These coaches/rake have to be adopted to Indian conditions i.e. dimensions, foot board height, and longer train i.e. about 550m length instead of about 140m length of trial rake. (i.e. with much higher number of coaches and/or longer coaches).
But this Indianised Talgo rake will be successful or not we can not say with certainty. If sech Indianised rake could give similar results to that of the present one, then it is fit for...
more...