Oct 19 2016 (13:00) GR/Kalaburagi Junction (Gulbarga) (4 PFs)
Ayan Bhaduri~
Ayan Bhaduri~ 865 blog posts3 Posts
only one train maintained at the moment i.e Gulbarga-Hyderabad Intercity... next should be Solapur-Mumbai 6 days a week... Solapur division should extend 11306 exp till gulbarga and can be maintained at Gulbarga pit line
What is capacity of Pit Line @ Gulbarga?
11305/06 SUR CSTM Exp has RSA with SUR BJP Biweekly Exp which is not necessary at all.
It can be extended till GR/Wadi by increasing reserved coaches..
11305/06 SUR CSTM Exp has RSA with SUR BJP Biweekly Exp which is not necessary at all.
It can be extended till GR/Wadi by increasing reserved coaches..
There is 1 Pit line at Gulbarga can maintain 24 coaches rake(Train). And this pit line can maintain 3 such rakes that means 3 trains can be started from Gulbarga with primary maintenance... Yes 11305/6 should be extended till Gulbarga and the solapur-bijapur exp can be made Gulbarga-solapur-bijapur exp also..
26 coaches capacity I believe.
-
If trains meant for GR are extended to SUR; then surely SUR trains can be extended to GR.
-
If trains meant for GR are extended to SUR; then surely SUR trains can be extended to GR.