Search Forum
Blog Entry# 2036266
Posted: Oct 25 2016 (19:20)
No Responses Yet
No Responses Yet
Oct 25 2016 (19:20) VM/Villupuram Junction (6 PFs)
TAGEERUANUBHARADWAJ^
TAGEERUANUBHARADWAJ^ 15157 blog postsINSPECTION OF THE SECOND BROAD GAUGE RAILWAY LINE
BETWEEN VILLUPURAM – TIRUVENNAINALLUR
AND SPEED TRIAL
Commissioner of Railway Safety, Southern Circle, Bangalore will inspect the newly laid second broad gauge railway line between Villupuram – Tiruvennainallur in Villupuram – Vriddhachalam section on 26th October, 2016. He will also conduct a high speed trial run between Tiruvennainallur – Villupuram on the same day between 15.00...
more...
BETWEEN VILLUPURAM – TIRUVENNAINALLUR
AND SPEED TRIAL
Commissioner of Railway Safety, Southern Circle, Bangalore will inspect the newly laid second broad gauge railway line between Villupuram – Tiruvennainallur in Villupuram – Vriddhachalam section on 26th October, 2016. He will also conduct a high speed trial run between Tiruvennainallur – Villupuram on the same day between 15.00...
more...