Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Shiv Ganga Express: mera bhola hai bhandari, karta Shiv Ganga ki sawari... Kashi Vishwanath Re, ohh bholenath Re... - Divyanshu Gupta

Search Forum
<<prev entry    next entry>>
Blog Entry# 2047292
Posted: Nov 03 2016 (23:07)

16 Responses
Last Response: Nov 07 2016 (17:14)
Poll
6221 views
20 votes
0

Nov 03 2016 (23:07)  
ps14003
ps14003   238 blog posts
Entry# 2047292              
According to Financial express, Talgo, the Spanish manufacturer of high-speed trains, is all set to lease out 2-5 trains to Indian Railways in less than a year’s time. Sources with knowledge of the matter told FE Online, that Suresh Prabhu-led Indian Railways is awaiting a final approval of Niti Aayog, before officially telling Talgo to lease out its trains to India. Once the contract is signed, it will take Talgo less than a year to supply anywhere between 2-5 trains. “The train is likely to be of around 26 coaches each, so that the total capacity matches that of the existing Shatabdis,” sources told FE Online.
Possible routes ------
Translate to English
Translate to Hindi
NO vote
Delhi - Mumbai
65%
13
Delhi - Amritsar
0%
0
Mumbai - Ahemdabad
10%
2
Delhi - Lucknow/Jaipur/Bhopal/Chandigarh
25%
5

1 Public Posts - Thu Nov 03, 2016

13 Public Posts - Sun Nov 06, 2016

2607 views
1

Nov 07 2016 (16:24)
I.R.needrejuvenation~
I.R.needrejuvenation~   1946 blog posts
Re# 2047292-15              
IR shall lose money if they convert 21 LHB coached (500M long) Mum/HWH Rajs into 26 Talgo coached (340M long) rake or replace LHB with Talgo in shatabdies.
It will be better if Raj/Shat with LHB coaches are operated at 160kmph.
IF current MUM raj is operated at 130kmph and given overriding priority which was given to Talgo train during trials, it can easily save 1-1.5 hrs i.e. do journey in 14.5- 15 hrs. And if speed is kept 160kmph like Gatiman, 12-13 hrs seems possible.
Huge
...
more...
expenditure in Talgo rake at this juncture, with IR in severe cash crunch is not justified when the job can be done without any capital expenditure.

Translate to English
Translate to Hindi

1 Public Posts - Mon Nov 07, 2016
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy