Search Forum
Blog Entry# 2048192
Posted: Nov 04 2016 (17:53)
1 Responses
Last Response: Nov 04 2016 (17:53)
1 Responses
Last Response: Nov 04 2016 (17:53)
Other News
SECR/South East Central
ankurgupta0602~ 4691 news posts
दक्षिण पूर्व मध्य रेलवे मंडल के कलमना-गोंदिया-दुर्ग खंड पर ट्रैक के मरम्मत See more at : click here
Very frequent mega blocks are being taken by SECR in BSP-R-DURG-NGP section leading to cancellation of many passenger trains and causing a lot of hardships to local commuters.
Are these mega blocks necessitated by the bye passing of regular maintenance of tracks, just in order to run maximum number of freight trains and earn huge revenue?
The tripling of freight laden Durg-BSP-JSG, a 2-decades old project is still only 50% commissioned, and Durg-RJN-NGP had been also moving at snail’s pace. Durg-BSP-JSG was one of the first long sections identified for tripling and...
more...
Are these mega blocks necessitated by the bye passing of regular maintenance of tracks, just in order to run maximum number of freight trains and earn huge revenue?
The tripling of freight laden Durg-BSP-JSG, a 2-decades old project is still only 50% commissioned, and Durg-RJN-NGP had been also moving at snail’s pace. Durg-BSP-JSG was one of the first long sections identified for tripling and...
more...