Search Forum
Blog Entry# 2050965
Posted: Nov 06 2016 (22:41)
11 Responses
Last Response: Nov 13 2016 (23:20)
11 Responses
Last Response: Nov 13 2016 (23:20)
Nov 06 2016 (22:41) NZB/Nizamabad Junction (3 PFs)
SingleTraveller^~
SingleTraveller^~ 3249 blog postsThe atlas shows that NZB-LPJL section as completed.
Is it so? If it is, when will trains start plying on that section?
It was slated to start in Nov 2016, I believe. Could someone please give the info.
Thanks.
Is it so? If it is, when will trains start plying on that section?
It was slated to start in Nov 2016, I believe. Could someone please give the info.
Thanks.
1 Public Posts - Mon Nov 07, 2016
3 Public Posts - Tue Nov 08, 2016
Thanks. But aren't all new lines designed with ROBs and RUBs, so that level crossings are totally eliminated? Also for NH16 if they construct level crossing, then that will be huge setback to the NH as I have seen it to be a 4 lane highway. Anyway, hopefully they build a bridge, which again will take a lot of time to finish, hence the line may be delayed.
1 Public Posts - Tue Nov 08, 2016
2 Public Posts - Wed Nov 09, 2016
3 Public Posts - Sun Nov 13, 2016