Is ECoR is planning speed upgradation of tracks from Cuttack to Bhadrak?? Because serious upgradation of tracks and signalling system is going on
1 Posts
But present max speed is 100. The route can be upgraded to 120 at least
Whatever the upgradations is going onn
Crs has to be done before increasing mps
Crs has to be done before increasing mps
But route can be made fit for 130. Their is not much geographical issues