Search Forum
Blog Entry# 2127790
Posted: Jan 15 2017 (11:15)
2 Responses
Last Response: Jan 15 2017 (16:53)
2 Responses
Last Response: Jan 15 2017 (16:53)
New Facilities/Technology
ML/Mumbai Local
aavinseth~ 27 news posts
The Mumbai Railway Vikas Corporation (MRVC) will soon carry out a study before commissioning an advanced signalling technology on the suburban corridor. The technology--communication -based train...
read more... Tech for communication between trains on track
Investment in the signaling & communication is the most cost effective and easily implementable solution to increase the carrying capacity of a saturated section of track. But IR has always resorted to costlier option of going for tripling which is costlier, time taking and involve tedious land acquisition, thaks to the engineering deptt. often bulldozing the relatively weaker deptt called signalling.
.
Only after going for advances train control as precondition to sanctioning of MUTP-III, did IR opted to go for it on the harbour line of Mumbai suburban Network.
....
more...
.
Only after going for advances train control as precondition to sanctioning of MUTP-III, did IR opted to go for it on the harbour line of Mumbai suburban Network.
....
more...