Search Forum
Blog Entry# 2148869
Posted: Feb 02 2017 (12:54)
10 Responses
Last Response: Feb 18 2017 (17:16)
10 Responses
Last Response: Feb 18 2017 (17:16)
Feb 02 2017 (12:54) 22109X/Mumbai LTT - Hazrat Nizamuddin AC SF Express
OvaisKhan_2011~
OvaisKhan_2011~ 135 blog posts22109 LTT NZM AC Exp. should be made to run from CSTM.
Also this train should be made to run 1 to 1.5 hr later than scheduled departure of 14.30 to 15.30 or 15.45 from CSTM.
So that frequency of this train can be increased biweekly or triweekly that's why the time slot should be changed for this train.
The duration of halt...
more...
Also this train should be made to run 1 to 1.5 hr later than scheduled departure of 14.30 to 15.30 or 15.45 from CSTM.
So that frequency of this train can be increased biweekly or triweekly that's why the time slot should be changed for this train.
The duration of halt...
more...
5 Posts
1.Extension to CSTM can be feasible if its RSA pattern is changed and also one rake if added more to it.
2.Though by Postponing the time available for secindary at NZM will be reduced but it will enable more services.The RSA needs to be modified.
Instead of starting the service from LTT at 14.30, it should be started from NZM at 14.30 and LTT/CSTM by 15.45.
4.Occupancy...
more...
2.Though by Postponing the time available for secindary at NZM will be reduced but it will enable more services.The RSA needs to be modified.
Instead of starting the service from LTT at 14.30, it should be started from NZM at 14.30 and LTT/CSTM by 15.45.
4.Occupancy...
more...
Khandwa can be considered, fully AC train will not make any revenue from Itarsi.
KNW ET se bada hai lekin ET ki passenger earnings KNW se bahut jyada hai plus ET bahut bada change over point bhi hai...