Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

For RailFans, seeing RAC-1/2/3 in Mumbai-UP Trains is more exciting than Election Results - rdb

Search Forum
<<prev entry    next entry>>
Blog Entry# 2183550
Posted: Mar 02 2017 (18:16)

15 Responses
Last Response: Mar 03 2017 (13:07)
Rail Fanning
35460 views
4

Mar 02 2017 (18:16)   BJU/Barauni Junction (8 PFs)
TouristerDivyanshu^~
TouristerDivyanshu^~   172569 blog posts
Entry# 2183550            Tags   Past Edits
In Upcoming months new Bridge on Ganga just few meters parallel of Rajender Pul near Mokama
It will be Double Deck Bridge for 4 lanes by Road and Double BG Tracks firstly it will be Single Line...
Project Worl to be started in May-June after the Inauguration by Honourable Prime Minister of India Shree Narendra Modi
And after sometime a new bridge project
...
more...
for only Roads also starts which is another side of Rajender Pul (BTPS side)
Means 3 Bridges total and Parallel of average 900 Meters
Importance of Bridge
single line from BJU to PNBE-KIUL side plus NH31 only 2 lane, the two new bridge were of jo use right now bcoz of long route, Rajender Pul is an important bridge joins the Bihar from north to south as well as Bridge us the Lifeline of North Bihar to Bihar Industrial Town Barauni also known as Industrial Capital of Bihar
IOCL-BTPS-SUDHA-BATA-NFL etc and more industry there....
NOTE
New Rail Bridge will not connected to HTZU/HTZ from BJU side it will not go to Rajender pul, it will divide at Chakia Thermal Halt and after bridge it will again divide and two line will go to Kiul side with meeting with current single track and for Patna side it will join Mainline after Tall Junction or may be at Mokama, there will be a new Railway Station after Bridge ends toward BJU side like RJO for loops, the name is not yet fixed it may be Barauni Thermal Power Station or it may be Barauni Town...
After this new lines and bridge no congestion at BJU from this side, freight moment faster and there will be more MEMU trains plying from MKA-SPJ etc...
There will more Pitlines at BJU soon as the lot of land is there for projects
#soon more info from BJU will be posted with some pics

Translate to English
Translate to Hindi

8 Public Posts - Thu Mar 02, 2017

1422 views
1

Mar 02 2017 (22:08)
TouristerDivyanshu^~
TouristerDivyanshu^~   172569 blog posts
Re# 2183550-9              
Soil leveling to ganga k ghats k ly ho rhi h vha is saal ardh kumbh mela lag rha h
Translate to English
Translate to Hindi

3 Public Posts - Thu Mar 02, 2017

3 Public Posts - Fri Mar 03, 2017
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy