And here is the most awaited one.
Ministry of Railways have properly allotted all according to feasibility. Now it's turn for ECR to stop operation over the furnace.
Ministry of Railways have properly allotted all according to feasibility. Now it's turn for ECR to stop operation over the furnace.
140 Public Posts - Sat Mar 11, 2017
14 Public Posts - Sun Mar 12, 2017
5 Public Posts - Mon Mar 20, 2017
There is a need of temporary solution as of now and at the same time maintain a train's intermediate stations. After, a permanent solution is available, everything will be restored back to normal. The bypass has to be constructed to avoid GMO LR.
But, I do not see returning of trains on ADRA-GMO section because there is no solution proposed and all trains will be diverted via BKSC or ASN which will be better.
But, I do not see returning of trains on ADRA-GMO section because there is no solution proposed and all trains will be diverted via BKSC or ASN which will be better.
4 Public Posts - Sat Mar 25, 2017