Search Forum
Blog Entry# 2194028
Posted: Mar 11 2017 (14:24)
3 Responses
Last Response: Jul 23 2017 (21:53)
3 Responses
Last Response: Jul 23 2017 (21:53)
kpy station platform 1 is in loop line.So it increase stoppage time of trains. one minute train stoppage consumes 10 to 15 minutes. So please reconstruct a new platform in main line instead of old platform number 1.
1 Public Posts - Sat Mar 11, 2017
1 Public Posts - Wed Jul 19, 2017
First remove loop track near PF No.1 (At that period trains which have stop in kpy towards ernakulam side can halt pf no.2 or 3. Other trains have no hindrance).After that widen PF No.1 to main track (ie, track towards kyj side).In this way we can avoid loop track of PF No.1. After this modification, in station control board very small change is needed.So cost required is less.