Search Forum
Blog Entry# 2215752
Posted: Mar 30 2017 (10:20)
28 Responses
Last Response: Apr 02 2017 (16:22)
28 Responses
Last Response: Apr 02 2017 (16:22)
Mar 30 2017 (10:20) 13049/Howrah - Amritsar Express (PT)
NAWABShatabdi~
NAWABShatabdi~ 7642 blog postsTrains 13049/50 Amrtisar express and 13005/06 Amritsar Mail both from Howrah To Amritsar..looks one of them should be converted into a superfast train and with an aggressive time table..
As both of them run back to back one of them should be running as a superfast now..
As both of them run back to back one of them should be running as a superfast now..
16 Public Posts - Thu Mar 30, 2017
10 Public Posts - Fri Mar 31, 2017
Converting them into Superfasts would mean removing some stoppages from their schedule which is not desirable since all such stations' passengers need to have direct connectivity with Kolkata and Amritsar (Although some redundant halts, especially back to back should be removed). This is the reason that IR started some SF trains like the Akal Takht and Durgiana Expresses.
.
PS: The need of the hour for IR is to LHBfy these 2 trains, complete the track doubling (and electrification) of the Varanasi - Rae Bareli - Lucknow Route and also the electrification (and...
more...
.
PS: The need of the hour for IR is to LHBfy these 2 trains, complete the track doubling (and electrification) of the Varanasi - Rae Bareli - Lucknow Route and also the electrification (and...
more...
1 Public Posts - Sun Apr 02, 2017