Apr 27 2017 (03:15) 15658/Brahmaputra Mail (PT) | DBRG/Dibrugarh (4 PFs) | SGUJ/WDG-4D/70647
ManishSinghPRYJ~
ManishSinghPRYJ~ 1321 blog postsBrahmaputra mail arrived GHY at 1245 hrs and departed at 1302 hrs by SGUJ WDG 4D 70647 on 26.04.17
Some member had posted IR notice about Katihar Kumedpur 25000 volt energization at KIR station blog some days before. Also I saw poles and wires today at old Malda, 3-4 KMS from MLDT, where the train 14055 was stopped for 30 minutes, even then, it reached MLDT at 0320 hrs 15 minutes before scheduled arrival and waiting till 0350 hrs for departure.
The wires and poles made feel that KIR to MLDT electrification will complete in six months. It is to be seen whether ER shows such interest for MLDT to Pakur electrification.
The wires and poles made feel that KIR to MLDT electrification will complete in six months. It is to be seen whether ER shows such interest for MLDT to Pakur electrification.
5 Public Posts - Thu Apr 27, 2017
4 Public Posts - Fri Apr 28, 2017
2 Public Posts - Sun Apr 30, 2017