Search Forum
Blog Entry# 2280565
Posted: May 17 2017 (18:06)
9 Responses
Last Response: Apr 07 2018 (15:17)
9 Responses
Last Response: Apr 07 2018 (15:17)
Ministry of Railways17-May, 2017 16:30 IST
Cabinet approves construction of double line with electrification between Guntur-Guntakal in Andhra Pradesh
.
Cabinet approves construction of electrified third line between Manmad-Jalgaon in Maharashtra
.
Cabinet...
more...
Cabinet approves construction of double line with electrification between Guntur-Guntakal in Andhra Pradesh
.
Cabinet approves construction of electrified third line between Manmad-Jalgaon in Maharashtra
.
Cabinet...
more...
7 Posts
IR must do doubling of MAHESANA- PALANPUR and KATIHAR - MUKURIA
With high pace
With high pace
It is not idiotic section it is historic section connecting Bezawada with Marmagoa opened in 1888-90 Mr.....
what is the current status of doubling between guntur and guntakal?
Its also one of the Port connectivity Project which connects Goa port to Vishakpatnam,Howrah,Chennai,Odissa ports through VSG-LD-GDG-GTL-GNT/RU routes.. VSG-GTL is also one of the High Density routes of India Named as HDN-7A with Mumbai-Chennai being HDN-7