Search Forum
Blog Entry# 2315128
Posted: Jun 10 2017 (17:21)
31 Responses
Last Response: May 06 2018 (01:58)
31 Responses
Last Response: May 06 2018 (01:58)
Jun 10 2017 (17:21) ARJ/Aunrihar Junction (7 PFs)
TouristerDivyanshu^~
TouristerDivyanshu^~ 177978 blog postsSome random clicks of Aurnihar Jn and Mahpur Station of ARJ-MAU Stretch...
Electrification work is in full pace as u can see the poles over ARJ, in December no poles installation and in just 6 months they did wiring too with poles installation...
Hope to see Elocos from 2018 :)
#Jackpot_June Edition
...
more...
Electrification work is in full pace as u can see the poles over ARJ, in December no poles installation and in just 6 months they did wiring too with poles installation...
Hope to see Elocos from 2018 :)
#Jackpot_June Edition
...
more...
26 Posts
Krna to sabse pehle isse hi chaiye tha ALD BSB via gyanpur road. Shayd BSB LOAD ni Lena cha rha hoga loco change ka.
ShivGanga Manduadih SF Vibhuti, SC-DNR sabhi E-Loco se chal paayenge but abhi tak Jhusi-Allahabad section par poles ke liye holes bhi nahi kiye gaye hai to bas yahi wajah hai ke isme time aur bhi lag sakta hai.
bsb pe vese b LC nhi hota h see 12236 and 12436
bsb pe staff shortage plus congestion h similar to LKO
thats why LC nhi hota h
umeed h electrification ho jaldi to LC ki jrurat hi na pde
bsb pe staff shortage plus congestion h similar to LKO
thats why LC nhi hota h
umeed h electrification ho jaldi to LC ki jrurat hi na pde