Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Poorva Express: हुगली सी बहती तेरी चाल है पूर्वा तू बेमिसाल है - Keshav Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 2326029
Posted: Jun 19 2017 (15:17)

4 Responses
Last Response: Jun 19 2017 (20:58)
General Travel
8406 views
4

Jun 19 2017 (15:17)   22417/Varanasi - New Delhi Mahamana Express | BSB/Varanasi Junction (11 PFs)
ps14003
ps14003   238 blog posts
Entry# 2326029            Tags   Past Edits
To enhance passenger experience, Railways Minister Suresh Prabhu has launched a mega project to overhaul nearly 40,000 old coaches. Under its "Mission Retro-Fitment" project, the Indian Railways will equip the coaches with better interiors, safety features and amenities including LED lights, anti-graffiti paint coats, branded fittings, powered Venetian blinds and smoke alarm systems. Besides new safety features, "Mission Retrofitment is an endeavour to provide better travel experience as the interiors of the coaches would be refurbished," the minister said.
1) Indian Railways plans to induct about 40,000 coaches with upgraded interiors by 2022-23, the transporter in a press release.
2)
...
more...
The programme includes refurbishing of coaches which includes upgradation with improved interiors. The approximate cost for this task is estimated at Rs. 30 lakh per coach.
3) The railways said 57 coaches have already been refurbished by Coach Rehabilitation Workshop, Bhopal and the refurbished coaches are running in Varanasi-New Delhi Mahamana Express since 22 January, 2016.
4) Besides fitment of panels without visible screws, LED lights, modular toilets with concealed plumbing, branded fittings, powered Venetian blinds and anti-graffiti coating, the refurbishing task would include enhanced safety features such as fire and smoke detection system (in newly manufactured AC coaches), double acting compartment doors (in AC coaches) and rounded edges at most locations for injury-free.
5) The refurbished coaches will also have bio toilets, passenger address/information systems, braille signage, ergonomic design and an increased number of mobile and laptop charging points, the railways said.
6) The Indian Railways plans to use better materials for the task, such as polycarbonate ABS, advanced composites, glass fibre reinforced plastic and stainless steel, among other features.
7) Indian Railways envisions improved passenger experience with its overhauling project.
8) "By 2020, Indian Railways would provide a new travel experience to the passenger over Indian Railways. This mission is challenging as it will be carried out without affecting the traffic operation," Mr Prabhu added.
9) In addition, for retro-fitment of Centre Buffer Coupler (CBC) with balanced draft gear, the transporter has estimated an approximate cost of Rs. 28 lakh per coach.
10) This task includes stripping of the lavatories and doorway area, gas cutting the end wall stanchions, headstock assembly and trough floor, fabrication of the head stock compatible with CBC, tack welding of the new head stock with the stanchions pillars and sole bar, inspection of the critical weld joints, painting with high performance anti-corrosive epoxy coating, replacement of sole bars as well as cleaning and painting.

Translate to English
Translate to Hindi

4644 views
1

Jun 19 2017 (17:57)
DQisthebest
DQisthebest   788 blog posts
Re# 2326029-1              
Railways is doing so much but passengers are not keeping the coaches properly.
Translate to English
Translate to Hindi

4564 views
0

Jun 19 2017 (18:07)
ps14003   238 blog posts
Re# 2326029-2              
Railways will have been transformed in other 8-9 years.
Translate to English
Translate to Hindi

5627 views
0

Jun 19 2017 (20:01)
guest   2747 blog posts
Re# 2326029-3              
Waiting for BRC-BSB mahamana express.
Translate to English
Translate to Hindi

4152 views
0

Jun 19 2017 (20:58)
ps14003   238 blog posts
Re# 2326029-4              
There will be plenty more it seems.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy