Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFans - once you meet them, friends for life

Search Forum
<<prev entry    next entry>>
Blog Entry# 2329942
Posted: Jun 23 2017 (09:56)

27 Responses
Last Response: Jun 25 2017 (01:52)
Race Blog
6207 views
2

Jun 23 2017 (09:56)   12304/Poorva Express (Via Patna) (PT) | PNBE/Patna Junction (10 PFs) | HWH/WAP-7/30371
guest   1686 blog posts
Entry# 2329942            Tags   Past Edits
NDLS-PNBE 999 kms @70.27 kmph avg.
Upto Ara, it was 72.17 kmph avg.
Faadu run till now.
Legendary Deluxe 😍😍😘😘
Translate to English
Translate to Hindi

22 Posts

2212 views
0

Jun 24 2017 (22:58)
HowrahRajdhaniKingofIR~
HowrahRajdhaniKingofIR~   8138 blog posts
Re# 2329942-23              
But the timing for 12303 reaching at ndls at 06:05 is still challenging.....
The better timing was the previous timetable 07:35 because the morning time gives more priority to the ncr trains
Translate to English
Translate to Hindi

2212 views
0

Jun 24 2017 (23:03)
HowrahRajdhaniKingofIR~
HowrahRajdhaniKingofIR~   8138 blog posts
Re# 2329942-24              
Up side pe poorva ki last timetable ko Kyu change kiya tha I still don't know..
Translate to English
Translate to Hindi

2309 views
0

Jun 25 2017 (01:46)
guest   1686 blog posts
Re# 2329942-25              
When it was at 110 mps, it has managed to reach NDLS @06:30 or so at a scheduled TT of 06:00 at NDLS. So, at 130 mps its not a big deal bt wat is being done by ECR/DNR n NCR is preventing it frm doing so.
Translate to English
Translate to Hindi

2357 views
0

Jun 25 2017 (01:51)
guest   1686 blog posts
Re# 2329942-26              
Dat TT was too slow. The point is overtake of 5 trollers as per d situation:
1) 12417
2) 12553
3) 12225
4) 12559
5)
...
more...
12427
These trns are never looped if 12303/81 runs behind these n these trns are solely responsible in addition of delays to Poorva. 12559 if overtaken somewhere, re-overtakes Poorva again n d whole situation can be thought of. Yesterday, 12303 was looped at ETW for an hr or so n was overtaken back to back by 12559, 12393, 12273, 12309 n 12403. Maybe some failure was there, bt I m not so sure, so I wud not comment on dat bt if there wasn't any failure, it clearly shows d mindset of NCR.

Translate to English
Translate to Hindi

2281 views
0

Jun 25 2017 (01:52)
guest   1686 blog posts
Re# 2329942-27              
It gets stuck only btn 2 sectns:
1) KCN-ALD
2) ETW-TDL
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy