Search Forum
Blog Entry# 2329942
Posted: Jun 23 2017 (09:56)
27 Responses
Last Response: Jun 25 2017 (01:52)
27 Responses
Last Response: Jun 25 2017 (01:52)
Jun 23 2017 (09:56) 12304/Poorva Express (Via Patna) (PT) | PNBE/Patna Junction (10 PFs) | HWH/WAP-7/30371guest 1686 blog posts
NDLS-PNBE 999 kms @70.27 kmph avg.
Upto Ara, it was 72.17 kmph avg.
Faadu run till now.
Legendary Deluxe 😍😍😘😘
Upto Ara, it was 72.17 kmph avg.
Faadu run till now.
Legendary Deluxe 😍😍😘😘
22 Posts
But the timing for 12303 reaching at ndls at 06:05 is still challenging.....
The better timing was the previous timetable 07:35 because the morning time gives more priority to the ncr trains
The better timing was the previous timetable 07:35 because the morning time gives more priority to the ncr trains
Up side pe poorva ki last timetable ko Kyu change kiya tha I still don't know..
When it was at 110 mps, it has managed to reach NDLS @06:30 or so at a scheduled TT of 06:00 at NDLS. So, at 130 mps its not a big deal bt wat is being done by ECR/DNR n NCR is preventing it frm doing so.
Dat TT was too slow. The point is overtake of 5 trollers as per d situation:
1) 12417
2) 12553
3) 12225
4) 12559
5)...
more...
1) 12417
2) 12553
3) 12225
4) 12559
5)...
more...