Search Forum
Blog Entry# 2331689
Posted: Jun 24 2017 (18:16)
4 Responses
Last Response: Jun 25 2017 (11:09)
4 Responses
Last Response: Jun 25 2017 (11:09)
Jun 24 2017 (18:16) 15011/Lucknow Jn. - Chandigarh Express | LJN/Lucknow Junction NER (6 PFs) | ET/WAG-5P/23825
brucewayne~
brucewayne~ 2901 blog postsNER Charbag, NER Varanasi and some of the random clicks....
1. & 2. ShabdBhedi SF at mainline of GhazipurCity resting with Izzatnagar EMD.
3. One DDU coach with Lucknow-Mumbai LTT-Pratapgarh Express spotted. While 4. & 8. shows the trainboards for the same train.
5. 6. & 7. The NER version of Lucknow Chandigarh Express via Bijnor at PF-5 waiting for starter signal with...
more...
1. & 2. ShabdBhedi SF at mainline of GhazipurCity resting with Izzatnagar EMD.
3. One DDU coach with Lucknow-Mumbai LTT-Pratapgarh Express spotted. While 4. & 8. shows the trainboards for the same train.
5. 6. & 7. The NER version of Lucknow Chandigarh Express via Bijnor at PF-5 waiting for starter signal with...
more...
1 Posts
summer heat, humdity and intense temprature.....
baaki apna City station is upgrading... pitline work is on pace.... electrification on fast pace....
baaki apna City station is upgrading... pitline work is on pace.... electrification on fast pace....
Single line electrification hoga bas kya ,double line k kya hua ? Ald se bsb ki koi report?
nothing on Allahabad Madhosingh route.
First will be single line electrification only from Chhapra to Aunrihar Jn. than work process from second phase, will be doubling of electrified route. as per source.
First will be single line electrification only from Chhapra to Aunrihar Jn. than work process from second phase, will be doubling of electrified route. as per source.