Search Forum
Blog Entry# 2345468
Posted: Jul 07 2017 (20:08)
21 Responses
Last Response: Jul 08 2017 (10:52)
21 Responses
Last Response: Jul 08 2017 (10:52)
Jul 07 2017 (20:08) 12293/Mumbai LTT - Prayagraj AC Duronto Express | KOPR/Kopar (4 PFs)
kingmaker~
kingmaker~ 16979 blog postsFIRST TIME EVER - Indian Railways Premier Train Allahabad Duronto Express In A NEW Avatar !!!
YouTube Link
A highly awaited, much discussed and well deserved allocation - the Linke, Hoffman and Busch rake for the 12293 LTT - Allahabad Duronto Express..
The train has been introduced with the modern LHB coaches also known as "Linke Hoffman Busch" (LHB) coaches. These coaches are being...
more...
YouTube Link
A highly awaited, much discussed and well deserved allocation - the Linke, Hoffman and Busch rake for the 12293 LTT - Allahabad Duronto Express..
The train has been introduced with the modern LHB coaches also known as "Linke Hoffman Busch" (LHB) coaches. These coaches are being...
more...
21 Posts
Sir, I guess WAG-5A locos are restricted to run at 75 kmph on sections that are converted from DC to AC traction.
It would have been more better had it duronto livery on it all coaches saving its distinct image
Wo 1987 ka Document hai
Now RB has asked loco sheds to upgrade G5s to 110kph
To make few G5s passenger fit locos And 1 needs to understand that LTT ETS is a small ETS. TI of locos takes time. Hence whichever loco is available after TI in rotation is attached.
Now RB has asked loco sheds to upgrade G5s to 110kph
To make few G5s passenger fit locos And 1 needs to understand that LTT ETS is a small ETS. TI of locos takes time. Hence whichever loco is available after TI in rotation is attached.