All Platforms in Pune Junction to be extended.
Extension might take atleast 5-6 years
#Pune_News
Source- Times Of India (16 July 2017, page 3)
Extension might take atleast 5-6 years
#Pune_News
Source- Times Of India (16 July 2017, page 3)
2 Posts
No I meant is land available on track to construct 24 coach long pf.bcoz it is city and I think there was flyover near station
For Platform#2 & 3 (see Pic 2) : Maybe if the extend it below Flyover, some track realignment is needed on the other side, they can be extended to a point just behind Jehangir Hospital
For Platform # 4 & 5 (see Pic 1): Track realignment is needed on both sides of the Platform if the want to extend it. They'd require a lot of blocks and extra work for extension
For Platform# 6 (see pic 1) : I'm not sure how much more length is required, but Electric Locomotive Trip Shed may...
more...
For Platform # 4 & 5 (see Pic 1): Track realignment is needed on both sides of the Platform if the want to extend it. They'd require a lot of blocks and extra work for extension
For Platform# 6 (see pic 1) : I'm not sure how much more length is required, but Electric Locomotive Trip Shed may...
more...
I think pf 2,3 n 6 can be extended to a certain level...
That too on Daund side...bcz on Mumbai side ELS is there
That too on Daund side...bcz on Mumbai side ELS is there