Search Forum
Blog Entry# 2359670
Posted: Jul 22 2017 (10:35)
10 Responses
Last Response: Jul 24 2017 (22:18)
10 Responses
Last Response: Jul 24 2017 (22:18)
Jul 22 2017 (10:35) 05306X/Lalkuan - Kanpur Anwarganj Special Fare Special | CPA/Kanpur Anwarganj (3 PFs)
PrakharYadav^~
PrakharYadav^~ 13290 blog posts05059/60 Lal Kuan Junction - Kanpur Anwarganj - Lal Kuan Junction (Tri-weekly) Special
.
Dainik Jagran dated 22 July 17
.
Dainik Jagran dated 22 July 17
5 Posts
there has been several news regarding doubling as well as electrification of CNB - FBD - KSJ but it didnt mention whether CPA - MDA can be doubled or not.
just by appearance, it seems doubling this 16km section parallel to GT road (N34, old no NH91) might be a challenge.
.
But i believe, if IR, PWD, #KPMRC and local authorities...
more...
just by appearance, it seems doubling this 16km section parallel to GT road (N34, old no NH91) might be a challenge.
.
But i believe, if IR, PWD, #KPMRC and local authorities...
more...
Definitely political willingness is required here along with the attention of NER.
I have read in a news article that an elevated section is being surveyed over the present tracks but the elevated metro planned over GT Road may turn down the plan of RLY's.
I have read in a news article that an elevated section is being surveyed over the present tracks but the elevated metro planned over GT Road may turn down the plan of RLY's.
Elevated tracks for this section, I heard in 2009. Hua kch nhi.
.
Actually, mda - pnk new line proposal has been surveyed but to IR, they didn't expect it to be fruitful. So more likely, dhande baste mei woh yojana.
Both NER n NCR have denied for it. They r also worried abt d expensive land cost...
.
Actually, mda - pnk new line proposal has been surveyed but to IR, they didn't expect it to be fruitful. So more likely, dhande baste mei woh yojana.
Both NER n NCR have denied for it. They r also worried abt d expensive land cost...
also good connectivity between lalkuan-mathura and ramnagar-mathura