Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

प्रयागराज एक्सप्रेस - जो भी हो तुम खुदा की कसम; लाजवाब हो

Search Forum
<<prev entry    next entry>>
Blog Entry# 2372586
Posted: Aug 06 2017 (11:39)

No Responses Yet
Info Update
3413 views
0

Aug 06 2017 (11:39)   12343/Darjeeling Mail (PT)
~   2741 blog posts
Entry# 2372586            Tags  
Darjeeling Mail History
Run via East Bengal
During the British period all connections to North Bengal were through East Bengal.
From 1878, the railway route from Kolkata, then called Calcutta, to Siliguri was in two laps. The first lap was a 185 km journey along the Eastern Bengal State Railway from Calcutta Station (later renamed Sealdah) to Damookdeah Ghat on the southern bank of
...
more...
the Padma River. The passengers would then avail a ferry across the river. The second lap of the journey was a 336 km metre gauge line of the North Bengal Railway that linked Saraghat on the northern bank of the Padma to Siliguri.[2]
Later the 1.8 km long Hardinge Bridge across the Padma came up in 1912. In 1926 the metre-gauge section north of the bridge was converted to broad gauge, and so the entire Calcutta - Siliguri route became broad-gauge.[2] The route thus roughly ran: Sealdah-Ranaghat-Bheramara-Hardinge Bridge-Iswardi-Santahar-Hili-Parabtipur-Nilphamari -Haldibari-Jalpaiguri-Siliguri.
The Darjeeling Mail ran on this route in pre-partition days. Even after the partition of India it ran on this route for some years.
Ferry across Ganges(Post-partition)
With the partition of India in 1947, the major hurdle in connecting Kolkata and Siliguri was that there was no bridge across the Ganges in West Bengal or Bihar. A generally acceptable route to Siliguri was via Sahibganj Loop to Sakrigali ghat, then across the Ganges by ferry to Manihari Ghat on the other side,then to Kishanganj via Katihar and Barsoi and finally through narrow gauge to Siliguri. In 1949 Kishanganj-Siliguri section was too converted to metre gauge,thus making the entire route an uni-gauge one.
Run via Farakka Barrage
In the early 1960s, when Farakka Barrage was being constructed, a more radical change was made. Indian Railways created a new broad-gauge rail link from Kolkata, and on a greenfield site south of Siliguri Town built an entirely new broad-gauge junction, New Jalpaiguri.
The 2,240 metres (7,350 ft) long Farakka Barrage carries a rail-cum-road bridge across the Ganges. The rail bridge was thrown open to the public in 1971, thereby linking the Barharwa-Azimganj-Katwa Loop Line to Malda Town, New Jalpaiguri and other railway stations in North Bengal. Since then Darjeeling Mail has been using the Howrah-New Jalpaiguri line.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy