Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

SBC - Kranti Veera Sangolli Rayanna Bengaluru: Station in Garden - Dinesh Kumar

Search Forum
<<prev entry    next entry>>
Blog Entry# 2374303
Posted: Aug 08 2017 (13:03)

6 Responses
Last Response: Aug 09 2017 (20:48)
Rail Fanning
8076 views
19

★★★
Aug 08 2017 (13:03)   GTL/Guntakal Junction (7 PFs) | GTL/WDM-3D/11180
MayavanPillai   3291 blog posts
Entry# 2374303            Tags   Past Edits
Alco Diesel Shed Guntakal GTL WDM-3D #11180 Showly Running At GTL /Guntakal Junction Yard ..))
Date - 07/08/2017 Monday ..
Translate to English
Translate to Hindi

5 Posts

3646 views
0

Aug 08 2017 (22:56)
SBCKLBGVandeSadharana~
SBCKLBGVandeSadharana~   10624 blog posts
Re# 2374303-6              
SBC-Nanded exp and YPR-Bidar exp could have got it till VKB too.
Translate to English
Translate to Hindi

3349 views
0

Aug 08 2017 (23:21)
BRCWAP7~
BRCWAP7~   13281 blog posts
Re# 2374303-7              
18519 had got ac traction btwn BZA WADI as bza vskp is single diesel line (branch line)
Translate to English
Translate to Hindi

3387 views
0

Aug 09 2017 (15:53)
fayazdm   491 blog posts
Re# 2374303-8              
YPR Bidar express cannot get e loco from VKB/GTL as this train passes through GTL DMM via kalluru which is a non electrified line . Now coming to SBC Nanded express Ur point is right. But I don't think there are better facilities for LSA at VKB to provide e loco's minus this train passes through Wadi B cabin ,so if at all this train is to be given AC traction ,it can be done at GTL.
Translate to English
Translate to Hindi

3419 views
0

Aug 09 2017 (19:09)
SBCKLBGVandeSadharana~
SBCKLBGVandeSadharana~   10624 blog posts
Re# 2374303-9               Past Edits
Bidar exp is a daily train, so diverting it via GY and running with E-loco could have been done till VKB. I think VKB can handle loco change, as Freight's used to get loco change at VKB when VKB-Wadi wasn't electrified, with e-loco going back to Sanathnagar Electric Trip Shed.
Translate to English
Translate to Hindi

3281 views
1

Aug 09 2017 (20:48)
fayazdm   491 blog posts
Re# 2374303-10               Past Edits
Already traffic is more on GTL DMM via GY line that train's like YPR SC garibrath , YPR DEE Duronto ,YPR Solapur SF express and MAS - SNSI SF express can't be diverted to run via GY.with great difficulty Indian railways have worked out for rajdhani to find a suitable and convenient time to run on GY line just bcoz to run with e loco end to end.So probably it's just a matter of time for GTL Kalluru line get doubled and electrified .I think by the end of 2018 all this doubling work would be finished and electrification can expect by 2019 to be completed.And then u can expect the above train's to run on AC traction.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy