Aug 15 2017 (15:09) ARJ/Aunrihar Junction (7 PFs)
Indian Train Lovers~
Indian Train Lovers~ 453 blog postsSoon this Diesel Section will also be lost under Electrification.
Electrification Work is in full Pace from BSB to BUI as said by the Railway Engineer working there.
Pole have been Erected and Wiring done just the minor fixtures remaining between BSB to BUI.
Electrification Work is in full Pace from BSB to BUI as said by the Railway Engineer working there.
Pole have been Erected and Wiring done just the minor fixtures remaining between BSB to BUI.
2 Public Posts - Thu Aug 31, 2017
no...but as soon as it gets completed they would submit the report MoR.
1 Public Posts - Tue Sep 05, 2017