Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

पूजा सुपरफास्ट - हर रोज़ चलूँ मैं तेरे साथ मंज़िल मंज़िल - by Shubham Yadav

Search Forum
<<prev entry    next entry>>
Blog Entry# 2389888
Posted: Aug 24 2017 (23:52)

5 Responses
Last Response: Aug 25 2017 (16:32)
Poll
3974 views
21 votes
1

Aug 24 2017 (23:52)   NDLS/New Delhi (16 PFs)
purubaba.ankit~
purubaba.ankit~   2861 blog posts
Entry# 2389888            Tags   Past Edits
If a train leads to reschedule by more than 10 Hours, then which is better? Rescheduling by more than 10 hours or cancelling the train???
I think Cancelling the train is good for next trip of train coz it will be on time.
Translate to English
Translate to Hindi
NO vote
Rescheduling by more than 10 Hours
62%
13
Cancelling the train
29%
6
Can't say
0%
0
Your own views ( Do comment)
10%
2

2506 views
1

Aug 24 2017 (23:56)
Pran22^~   55663 blog posts
Re# 2389888-1              
10-16 hrs re-scheduling is ok at times.
But more than 16 hrs late cancelling is better for a daily service.
Translate to English
Translate to Hindi

2258 views
1

Aug 25 2017 (09:07)
AvishekRay~
AvishekRay~   3874 blog posts
Re# 2389888-2              
Of course rescheduling. Lots of people are directly/indirectly dependent on a trip of a train. Besides, if a train is rescheduled more than 3 hrs then IR is liable for a full refund for a passenger willing to cancel.
Translate to English
Translate to Hindi

2363 views
1

Aug 25 2017 (09:42)
Baaz_SGUJ_WDP4~
Baaz_SGUJ_WDP4~   1656 blog posts
Re# 2389888-3              
Any short route train (overnight ones) with one side journey time less than 10 hours, can still be rescheduled as the resulting rescheduling chain won't last long.
Cancellation of longer route trains should be done if the delay is equal to/or more than the difference of resting time at destination station and minimum time required for primary maintenance. e.g. 14055/56 BP Mail rests at Dibrugarh for 19 hours. Considering that CDO Dibrugarh will require 6 hours for maintenance of BP Mail, the maximum delay that should be allowed for BP Mail from Delhi, should be 19-6=13 hours. Moreover, average delay of train can also be included here.
I
...
more...
think a good solution for IR is to have standard rake composition for different type of trains. I mean superfast trains can have a standard 24 rake composition with fixed number of AC, Sleeper and General Coaches in all trains. Same for Shatabdi and Rajdhani type trains. By doing this, delay of trains can be reduced as Railways can keep buffer rake(say X) to be used for one train(say 1 UP), and then the rake of corresponding link train(1 Down) can be used for other train (say 2 UP).

Translate to English
Translate to Hindi

2319 views
1

Aug 25 2017 (09:58)
Maddy~
Maddy~   7820 blog posts
Re# 2389888-4              
As passenger are liable to get full refund after 3hrs, its passenger choice whether to travel or not. Rescheduling train will not effect the passengers who are willing to travel
Translate to English
Translate to Hindi

2253 views
1

Aug 25 2017 (16:32)
A2Z~
A2Z~   17505 blog posts
Re# 2389888-5              
* Rescheduling may be good or bad depending how much cushion time the rake have in the yard. * IF it has a cushion time of 6-7 yrs it should be rescheduled and return trn shall depart 3-4 hrs late
* if 10 late running means late departing by 10hrs, then effort should be done to arrange spare rake to ensure timely departure of the return train.
* Else cancelling may be right step to set punctuality right.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy