Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

22222/22221-->Aapli Rajdhani, Asli VIP number waali - Somanko

Search Forum
<<prev entry    next entry>>
Blog Entry# 2393805
Posted: Aug 29 2017 (18:09)

No Responses Yet
Info Update
3229 views
0

Aug 29 2017 (18:09)   SUD/Sudhani (2 PFs) | KTE/WDG-3A/14526R
guest
Entry# 2393805            Tags   Past Edits
Northeast Frontier Railway Official Facebook Page
The flood damaged portion of track on the UP line along with bridge no 133 between Sudhani and Telta station has been certified fit by the Engineering department of N.F.Railway at 13-25 p.m. today. The first goods train which left Sudhani station at 13-50 p.m. to arrive Telta at 14-25 p.m. passed over that section safely. The portion has been certified fit upto a maximum speed of Stop dead 10 KMPH.
The portion of repaired track will be kept under very close observation under the passage
...
more...
of goods trains and movements of passenger trains will be commenced from 3rd September. With the movements of goods trains, the flow of incoming essential commodities to the Northeast area will be restored. The speed restriction will continue and all trains in the effected section will ply at restricted speed till such time that permanent repairs are carried out. It is to be mentioned that very extensive damage has been caused in the vicinity of bridge no 133 with scouring to a depth of 12 to 15 meter and extent of 70 meter in the approach of the bridge.
It may be mentioned here that train services over parts of Bihar and West Bengal under Katihar and Alipurduar Divisions of N.F. Railway had to be suspended due large scale damage of track in many locations. Thereby disrupting direct train communication of NE Region with rest of the country.
Estimated commercial loss from 13th to 28th August, 2017:
 Nos of Mail/Express trains cancelled : 821 nos
 Nos of passenger trains cancelled : 484 nos
 Total loss in PRS : Rs. 47.53 crs
 Total loss in Non-PRS : Rs. 5.30 crs
 Ticket checking segment : Rs. 1.44 crs
 Passenger reduced (PRS) : Rs. 4,02,653 nos
 Passenger reduced (Non-PRS) : Rs. 11,27,277 nos
 Loss from Goods booking : Rs. 16.26 crs
 Loss from Parcel booking : Rs. 3.51 crs.
Total Commercial loss amounts to Rs. 74.04 crs. This is apart from the amount which has been refunded to passenger. The losses to other departments like Engineering, Signal & Telecommunication etc. are being assessed.
Thousands of labors along with railway officials worked round the clock at all damaged sites to restore the train services during this period.
Trial Run made by Duo of
KTE WDG3A 14562R nd NGC WDG3A 14758R

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy