Search Forum
Blog Entry# 2393805
Posted: Aug 29 2017 (18:09)
No Responses Yet
No Responses Yet
Northeast Frontier Railway Official Facebook Page
The flood damaged portion of track on the UP line along with bridge no 133 between Sudhani and Telta station has been certified fit by the Engineering department of N.F.Railway at 13-25 p.m. today. The first goods train which left Sudhani station at 13-50 p.m. to arrive Telta at 14-25 p.m. passed over that section safely. The portion has been certified fit upto a maximum speed of Stop dead 10 KMPH.
The portion of repaired track will be kept under very close observation under the passage...
more...
The flood damaged portion of track on the UP line along with bridge no 133 between Sudhani and Telta station has been certified fit by the Engineering department of N.F.Railway at 13-25 p.m. today. The first goods train which left Sudhani station at 13-50 p.m. to arrive Telta at 14-25 p.m. passed over that section safely. The portion has been certified fit upto a maximum speed of Stop dead 10 KMPH.
The portion of repaired track will be kept under very close observation under the passage...
more...