Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Tamil Nadu Express - தங்களை அன்புடன் வரவேற்கிறது - Swaroop Kutti

Search Forum
<<prev entry    next entry>>
Blog Entry# 241154
Posted: Sep 21 2011 (15:18)

14 Responses
Last Response: Nov 14 2011 (14:28)
35217 views
8

Sep 21 2011 (15:18)   CRJ/Chittaranjan (3 PFs)
 
amit.mint^~
amit.mint^~   6175 blog posts
Entry# 241154            Tags  
This blog I dedicate to Chittaranjan where I spent 19years...:)
CLW(Chittaranjan Locomotive Works):
Founded in 1947 the company is named after the Indian freedom-fighter Chittaranjan Das. The manufacturing unit was established at a place close to the [[Mihijam|Mihijam railway station in Barddhaman district], in the state of West Bengal. The 18.34 km2 township, which included a factory, 191 km. of roadways, 43 schools, 9,131 staff quarters, 8 clinics (including a 200 bed hospital) and 7 markets, was built at a cost of Rs. 140 million and had a population of over 80,000. The
...
more...
factory commenced the production of steam locomotives on the 26 January 1950 (the date when India formally declared itself a Republic), in collaboration with the North British Locomotive Company. On November 1, 1950 Indian President Dr. Rajendra Prasad formally dedicated the first steam rail-engine produced by the company (a WG class locomotive bearing the registration number 8401) to the freedom fighter Deshbandhu Chittranjan Das. The name of the nearby railway station Mihijam was also changed to Chittaranjan. Post-1968 the factory began to manufacture diesel-hydraulic locomotives. The production of steam and diesel locomotives were discontinued in 1973 and 1994 respectively. The company has since been manufacturing only electric rail-engines. It is now the only government electric loco producing factory in India.The factory obtains its iron & steel from Asansol and Jamshedpur and hydel power from Maithon Dam. The township under CLW i.e. Chittaranjan is bordered by high boundaries and 3 main gates, and guarded by Railway Protection Force(RPF), Railway Protection Special Force(RPSF) and also West Bengal police.
In pic:14th October 1961-Inauguration of First Electric Locomotive(WCM)

Translate to English
Translate to Hindi

9 Posts

5186 views
0

Oct 17 2011 (18:33)
amit.mint^~
amit.mint^~   6175 blog posts
Re# 241154-10              
CRJ has only three platforms. All Down line Mail/Express/Janshatabdi trains arrive @PF#2 at CRJ where as Passenger/EMUs arrive at PF#1.
Rest all UP line Trains arrive at PF#3.
Not sure if this can be updated for all trains arriving/departing at same time.
Please update thanks.
A
...
more...
recent pis of CRJ station :)

Translate to English
Translate to Hindi

4950 views
0

Oct 17 2011 (18:50)
IndianTrainFanonTwitter~
IndianTrainFanonTwitter~   10340 blog posts
Re# 241154-11              
This is a vdo of CRJ Stn taken by me from NDLS - HWH Rajdhani Exp via Patna : /blog/post/254281/54
The station is a Junction but with only 3 platforms ? Needs improvement by ER :)
Translate to English
Translate to Hindi

5096 views
1

Oct 17 2011 (19:16)
amit.mint^~
amit.mint^~   6175 blog posts
Re# 241154-12              
Railfan CRJ is not a junction,did you mean Sitarampur Jn as Gaya and Patna lines meet here?
btw nice Video Railfan.it was a good speed crossing.and loved to see CRJ.thanks for posting.
Translate to English
Translate to Hindi

5078 views
1

Oct 18 2011 (19:13)
IndianTrainFanonTwitter~
IndianTrainFanonTwitter~   10340 blog posts
Re# 241154-13              
Flickr Photo by Mr. SuperSanjit123 : of the Sign Board of Chittaranjan Railway Station .
++++++++++
PS : You are right Amit Sir , CRJ is not a Junction at present . Yes , Sitarampur Jn is the Point where the Grand Chord Route and Main Line Route Tracks separate , only to join back together at Mughalsarai Jn Outer Signal :)
Translate to English
Translate to Hindi

6414 views
1

Nov 14 2011 (14:28)
amit.mint^~
amit.mint^~   6175 blog posts
Re# 241154-14              
A CRJ railway calender pic of two WAG9 locos manufactured in Chittaranjan Locomotive Works (CLW). This was for the year 2007.
#31082 in green with yellow stripe
#31086 in Red with White stripe
Both belong to Gomoh (GMO) shed currently.
...
more...

Loco Cost in 2007:
the WAP-4, with transfer price of Rs 5.05 crore each,
the WAG-7 type costing Rs 5.03 crore,
the WAG-9 priced at Rs 11.87 crore
and the WAP-7 with transfer price of Rs 11.85 crore.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy