Search Forum
Blog Entry# 2419451
Posted: Sep 25 2017 (10:16)
6 Responses
Last Response: Sep 27 2017 (14:47)
6 Responses
Last Response: Sep 27 2017 (14:47)
Track Replacement work at bharathapuzha bridge at SRR today, from 600AM to 9.00AM the traffic was blocked.
1 Posts
I m at delhi dear , i got this pic from mathrubhumi news paper
Modiji ya Goyalji se baat kariye ...
Aur kch nahi to bhi kam se Kam Azamgarh per Vikas Naam ka Station Master to ker hi denge aur is tarah Azamgarh per Vikas aa jayega 😁
Aur kch nahi to bhi kam se Kam Azamgarh per Vikas Naam ka Station Master to ker hi denge aur is tarah Azamgarh per Vikas aa jayega 😁
Any news if there is an additional bridge connecting SRR-Ers stretch? As of now this is a single line and trains have to wait at the outer before the bridge.e
Quite strange that SR has unable to solve this bottleneck !!! Jut after SRR and just before the bridge, one can see some construction and laying of track....
Quite strange that SR has unable to solve this bottleneck !!! Jut after SRR and just before the bridge, one can see some construction and laying of track....