Oct 10 2017 (15:39) 12163/Mumbai LTT - MGR Chennai Central SF Express (PT) | GTL/Guntakal Junction (7 PFs)
robin~
robin~ 6144 blog posts7 Posts
Electric link i.e RPM WAP7 up to Wadi right ?bcoz Wadi Guntakal electrified and two train's i.e 12163/4 Dadar - MS - Dadar SF express and 11027/8 CSTM - MAS - CSTM mail has been given green signal to proceed all the way till Wadi with electric link.
Wadi to MS electric loco link WAP7 is been given to this train
only DD-Wadi section is not fully electrified and work is going on at good pace so hope we can see electric locos on this section also
It's Daund Gulbarga bro not Wadi.Gulbarga Wadi electrfication over and energised the only part on GR Wadi which is not energised with 25kv volts is some 1 or 1.5 kms at Wadi outer towards Gulbarga.Anyway's how's the doubling progress from Daund Gulbarga ?