Search Forum
Blog Entry# 2555639
Posted: Oct 18 2017 (23:58)
No Responses Yet
No Responses Yet
Oct 18 2017 (23:58) 77609/Falaknuma - Manoharabad DEMU | MED/Medchal (5 PFs)
Sheikkaleemmaulali~
Sheikkaleemmaulali~ 806 blog postsMmts phase 2 doubling electrification between bolarum and medchel
Total doubling and electrification done
One extra pf is bieng constructed at gundlapochampally and mechel.medchel station wiring is waited toatal doubling done without track linking at bolarum and medchel.n3w track is on right side upto gundlapoachampally left side upto medchel.
Total doubling and electrification done
One extra pf is bieng constructed at gundlapochampally and mechel.medchel station wiring is waited toatal doubling done without track linking at bolarum and medchel.n3w track is on right side upto gundlapoachampally left side upto medchel.