Important Updates to be marked on Atlas :-
Admin plz make the following changes :-
(1) Jalandhar-Jammu Doubling :- Only Madhopur-Kathua section is under Doubling process as the Ravi second bridge is under construction. Other than this all the streatch is already functional on double line.. Beas river bridge is also ready.. only inauguration is pending. I don't know why there are so many under construction patches shown in the atlas.. plz correct it.
(2)...
more...
Admin plz make the following changes :-
(1) Jalandhar-Jammu Doubling :- Only Madhopur-Kathua section is under Doubling process as the Ravi second bridge is under construction. Other than this all the streatch is already functional on double line.. Beas river bridge is also ready.. only inauguration is pending. I don't know why there are so many under construction patches shown in the atlas.. plz correct it.
(2)...
more...
5 Public Posts - Tue Nov 07, 2017
Sir,
Jind-Rohtak Doubling still not updated..!! Plz mark this section as Double electrified section. In IRI Atlas its still showing doubling progress.... Its already double line.. plz correct.. Thanks
Jind-Rohtak Doubling still not updated..!! Plz mark this section as Double electrified section. In IRI Atlas its still showing doubling progress.... Its already double line.. plz correct.. Thanks
8 Public Posts - Wed Nov 08, 2017