Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

হাওড়া - বর্দ্ধমান কর্ড লাইনে যান, 130 কিমি বেগে ট্রেন যাওয়াও কালবৈশাখী ঝড়ের থেকে ভয়ঙ্কর! - Jishnu Thakur

Search Forum
<<prev entry    next entry>>
Blog Entry# 2857565
Posted: Dec 06 2017 (15:08)

17 Responses
Last Response: Jul 25 2018 (01:50)
1 Followers
Info Update
14927 views
1

Dec 06 2017 (15:08)   12924/Nagpur - Dr. Ambedkar Nagar SF Express
Pratik~
Pratik~   5604 blog posts
Entry# 2857565            Tags  
WAP-5 is mentioned as the 'Mislink' by an official site
29-Jun-17 12924 Dir 42 CR NGP 30105 BRC WAP5 3-Phase IB, BRC, Apr 28 2017 Miscellaneous (NGP-INDB, load 22B) 32" loss on run between Kalmeswar-Metpanjra & 15" Narkher-Pandurna for wheel slipping with LSP glowing and speed reduced due to gradient 1:65 with 3 degree curve and rainy weather. As per JPO Banker to be provided Ex.TEO during rainy weather. No loco trouble. Being refuted. IB-28.04.17, TI/PA-26.06.17. Section major: NGP-AMF. (WAP4/BRC link, Mislink by WR) 0 As per LP, due to rain in section between KOHL-SNKB-MER (having gradients 1:150 and 1:160) with curvatures wheel slipping occurred and speed dropped gradually up to 18-20 kmph, hence took extra time. Due to wheel slipping, tractive effort reduced and bogiemeter reading comes down to 100-105 KN. As per JPO
...
more...
Banker to be provided for trains 18 B and above in ghat section of NGP division during monsoon season.

Translate to English
Translate to Hindi

1 Public Posts - Wed Dec 06, 2017

12 Public Posts - Thu Dec 07, 2017

2 Public Posts - Thu Jul 19, 2018

1 Public Posts - Wed Jul 25, 2018

7838 views
0

Jul 25 2018 (01:50)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 2857565-17               Past Edits
Seeing as to how the P7 too is facing similar issues in rainy conditions (and in those two cases posted above, on milder gradients and in one case only a 19 coach load), it is puzzling as to how CR concluded that it is a problem with the locos. At least these two incidents definitely do not show any smooth operations. Particularly, in the second incident, the loco was an IGBT loco, which is supposed to have even better wheel slip control.
Also SCR operates 24 coach trains on the SC-KZJ section (which has a lot of frequent gradients) with WAP4 locos and as far as I know, they have never issued any such restriction. And in fact,
...
more...
in the same section, WAP7's have stalled multiple time because of wheel slip with the 22 coach LHB SBC Raj and the 24 coach ICF Telangana (AP) express, in rainy conditions. But both P4 and P7 continue to operate freely on this section.
It will be interesting to know how what forced BSL division to make this decision.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy