Search Forum
Blog Entry# 2887232
Posted: Dec 14 2017 (12:30)
10 Responses
Last Response: Dec 15 2017 (07:46)
10 Responses
Last Response: Dec 15 2017 (07:46)
Dec 14 2017 (12:30) 12555/Gorakhdham SF Express (PT) | KRJ/Khurja Junction (5 PFs) | GD/WDP-4D/40307
TRIDENT~
TRIDENT~ 385 blog postsSurprise link....!!!!
12555 GKP - HSR Gorakhdham Express with GD WDP-4D #40307 at Khurja Jn.
Captured on 13/12/2017
12555 GKP - HSR Gorakhdham Express with GD WDP-4D #40307 at Khurja Jn.
Captured on 13/12/2017
8 Posts
Good news....but what will the 5th line cater to? It will just act like a holding line for the outer of NDLS if I am right, because the two branch lines are still double lines.
for ndls gzb section it will cater mostly. Electrification of this line going on right now. as for lc loco goes upto beyond minto bridge where this work is going on hence stopped lc.