#EtAldElectrification
#jbpNews
-PF#1 & #2 along with thru' lines in between ready with wiring.
-Contact wire tightening is left in few places.
-Some...
more...
#EtAldElectrification
#jbpNews
-PF#1 & #2 along with thru' lines in between ready with wiring.
-Contact wire tightening is left in few places.
-Some...
more...
17 Posts
ACOI MKP COMMISSIONED
AFTER PPI JBP COMMISSIONING, JBP KTE WILL BE DONE TILL MARCH 2018
THEN KTE STA WILL BE DONE TILL DEC 2018 AND
IN THE LAST STA MKP UPTO MARCH 2019
AFTER PPI JBP COMMISSIONING, JBP KTE WILL BE DONE TILL MARCH 2018
THEN KTE STA WILL BE DONE TILL DEC 2018 AND
IN THE LAST STA MKP UPTO MARCH 2019