Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

ಮೈಸೂರು - ವಾರಣಾಸಿ ಎಕ್ಸ್‌ಪ್ರೆಸ್: ಕಾವೇರಿ ಮತ್ತು ಗಂಗಾ ನದಿಗಳ ಸಂಪರ್ಕ ಸೇತುವೆ - Vishwanath Joshi

Search Forum
<<prev entry    next entry>>
Blog Entry# 3034361
Posted: Jan 24 2018 (16:20)

9 Responses
Last Response: Jan 28 2018 (17:38)
Timeline
3200 views
0


Pran22^~
Jan 24 2018 (16:10)
Jan 24 2018 (16:10)   Netaji Express/12312   Train - Train Name/Number
Pran22^~   35324 Conf TLs   205 Void TLs
Number: 12312
Train Name: Kalka Mail
Regional Name: کالکا میل
Hindi Name: कालका मेल
Inaugural Run: 1866-01-01

Jan 23 2018 (17:42)   (previous value)
Timeline Entry# 1828746
by: TheMadrasMail~
Number: 12312
Train Name: Kalka Mail
Regional Name: کالکا میل
Hindi Name: कालका मेल
Inaugural Run: 1891-03-01

4 Public Posts - Wed Jan 24, 2018

1 Public Posts - Sat Jan 27, 2018

2 Public Posts - Sun Jan 28, 2018

1835 views
1

Jan 28 2018 (16:49)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 3034361-8              
You are right about the ferries. In the early years, trains were run on whatever length of the route was available. For example, even in the 1850's, when the railway connection was only available till Jamalpur, passengers would be carried by train till the limits of the railway, and from there, would take a tonga or a ferry along the Ganga till Allahabad, then switch to the railway between Allahabad and Kanpur and again take a road or river route till Delhi and Lahore. But these are not necessarily 'complete' trains. For the ferry and road transport arrangements had to be mostly taken care of by the passengers themselves. Some First class passengers or Elite Indian passengers would have the arrangements made by the railway company itself, but most would have to make their own arrangements. That way, through running of a train end-to-end on the route, is a better indication...
more...
of a consistent railway service, and usually marks the inauguration of a new, dedicated service.
If you observe the Report of railway construction in my earlier post, and the timetable from 1889 in my initial post, you will observe that the railway route between Calcutta and Lahore was completed by 1870. and a simple google search for a 'Calcutta mail' or 'Calcutta Lahore/Peshawar mail' in Google books, will give you several records for a Calcutta-Peshawar mail between 1870 and 1891 and these records will also clearly indicate that this was the ONLY mail service on the route. There was no separate mail train on the route. Some sectional coaches would run between Calcutta-Delhi and Delhi-Lahore, while the remaining coaches would complete a through run all the way to Lahore and beyond. The mail train that was inaugurated in 1865 (or 1866/67, but the date doesn't really matter) was ALREADY extended to Peshawar by the time the Kalka line was opened. There was no other mail train to be extended! It was only in 1891, that a second, faster mail train was introduced on the route, and this was the Kalka mail, which was introduced as a dedicated train just for the sake of moving people between Calcutta and Simla, the summer capital of the Raj.

Translate to English
Translate to Hindi

1 Public Posts - Sun Jan 28, 2018
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy