Search Forum
Blog Entry# 3099891
Posted: Feb 13 2018 (01:57)
No Responses Yet
No Responses Yet
What a control funtastic The train takes 3.05 hrs to cover 97km distance between Bagalkot to Bijapur and wonder is no any train for crossing in this stretch so this single train enjoys snails speed of 32kmph for 97km.. This type of controlling is award winning control for this section.. Marvellous job of UBL controller to run this train for 3.05hrs instead of maximum 1.8 to 2 hours with low quality of Signaling and Tracks provided by SWR during GC.