Search Forum
Blog Entry# 3102906
Posted: Feb 13 2018 (22:58)
8 Responses
Last Response: May 02 2019 (09:21)
8 Responses
Last Response: May 02 2019 (09:21)
SR should make Cbf as a satellite station of Cbe jn by increasing the platform number to 4/5 and constructing pitlines and stable lines here to park the trains from cbe jn.
The pit lines can come up in the place of goods yard and a platform can be constructed in the side of the station building.
If this is done, more trains can be operated from Cbe jn and more trains can have a halt at Cbf........
The pit lines can come up in the place of goods yard and a platform can be constructed in the side of the station building.
If this is done, more trains can be operated from Cbe jn and more trains can have a halt at Cbf........
2 Public Posts - Tue Feb 13, 2018
3 Public Posts - Wed Feb 14, 2018
1 Public Posts - Wed Feb 14, 2018
1 Public Posts - Thu May 02, 2019