Search Forum
Blog Entry# 313648
Posted: Dec 28 2011 (10:40)
65 Responses
Last Response: Nov 19 2013 (03:28)
65 Responses
Last Response: Nov 19 2013 (03:28)
New Route Work almost finished about 75%
Kadur(DRU)-Chikmagalur...
I hope WDG3 is In-Charge of Trail Run...
Hope on Blessings of Mr.Muniyappa State RoM, Work will finish at earliest...
Kadur(DRU)-Chikmagalur...
I hope WDG3 is In-Charge of Trail Run...
Hope on Blessings of Mr.Muniyappa State RoM, Work will finish at earliest...
61 Posts
Yes, As it has RSA with SMET - RRB passenger, May need some modification of the Passenger train too.
Thats true. I think if IR can manage one set of extra rake then most of the trains can be extended. With present timings even Intercity wont be of much use as it reaches SMET at 10pm and from there may take another 2hrs to reach Talaguppa which will not be that popular. Better option is to make 56227 depart SBC at 2pm and reach Talaguppa by 11pm or so.