Line Capacity Utilisation as on 2015.
Rajpura-Bathinda an A3 category doubling project crossing 130% above capacity or line saturation. As per A3, its a critical project needed immediate attention.
Rajpura-Bathinda an A3 category doubling project crossing 130% above capacity or line saturation. As per A3, its a critical project needed immediate attention.
2 Posts
Can you please post it here. thats an excellent document i think,
undoubtedly ! which means , IR has to complete Doubling and Electrification of RBR by 2021 by all means, for this to start getting returns at the earliest, to prevent over throwing.
Thanks a ton, where does it speak about SCR and SWR and CR zones?