Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

हाटे-बाजारे एक्सप्रेस : चलती - फिरती मछली बाजार - Piyush Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 3189613
Posted: Mar 10 2018 (11:24)

2 Responses
Last Response: Mar 15 2018 (22:18)
General Travel
19834 views
12

★★
Mar 10 2018 (11:24)   ACOI/Allahabad Chheoki Junction (3 PFs)
ManishSinghPRYJ~
ManishSinghPRYJ~   1321 blog posts
Entry# 3189613            Tags   Past Edits
Platform 1 (after increasing of height and increase of length for 26 boggies and shed making)
Earlier this platform had only station board before 2014-15
No platform height(concreting), no shed, no toilets, no shopstalls etc
When after 2014-15, many trains started diverting from here, this platform was ignored and platform 2-3 was constructed that time in south side.
But
...
more...
now it is being renovated to increase height and for 26 bogie type.
But I think railway didn't plan well. In North there are two lines, up and down for main line (ndls hwh)
Then this platform 1 having opening only to recieve train towards one end (south end)
North side line (Up line mentioned above) is two metres far from the platform.
Then there are six loop lines towards its south.
Then platform 2-3 combined.
I think if railway ne centre wali 6 loop lines me se do lines hatakar platform banaya hota to platform ke dono side ka utilisation ho jaata
But now only one side is used
Pic 1: Platform 1 seen from FOB
Pic 2: Allahabad Chheoki stn from road side
Pic 3: Platform 2-3 seen from FOB
Pic 4: New escalator at ACOI stn
Pic 5: New approach road decreasing distance of ACOI from Ald by 1 km (900 metres exactly)

Translate to English
Translate to Hindi

10988 views
0

Mar 15 2018 (15:28)
UtkarshTiwariRewa~
UtkarshTiwariRewa~   7542 blog posts
Re# 3189613-1               Past Edits
Are appropriate facilities there like Cloakroom, Food Stalls, Waiting Hall etc. ?
What are the future plans for this Station ?
New Platform, Food Court, yards etc. ?
Awesome coverage BTW
Translate to English
Translate to Hindi

13188 views
1

Mar 15 2018 (22:18)
ManishSinghPRYJ~
ManishSinghPRYJ~   1321 blog posts
Re# 3189613-2               Past Edits
1 compliments
Really useful info, thanks ☺
Cloakroom No plan
Waiting room: Open walled and very small
Food stalls: Many dhaba just outside station on Allahabad Mirzapur NH 76E, Refreshments Stall on platform 2-3
No new platform planned
03 are sufficient for
...
more...
passing trains and only one passenger train originating (ACOI ET passenger)
No Yard planned
After DFC Commissioning in end 2019 between bhaupur and mughalsarai, the six(06) loop lines between platform 1 and platform 2-3 will be free as Yard type as they caters only for looping goods train now
But also there is space towards south side for making 3-4 line Yard which in future can be utilised

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy