Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

हमसे सीखे कोई जीने का सलीका। सफर कैसा भी हो, मौज़ उडाये जाते हैं।। - Amir

Search Forum
<<prev entry    next entry>>
Blog Entry# 3221969
Posted: Mar 20 2018 (18:25)

1 Responses
Last Response: Mar 20 2018 (18:33)
General Travel
3897 views
9

Mar 20 2018 (18:25)   HWH/Howrah Junction (23 PFs)
~   2315 blog posts
Entry# 3221969            Tags   Past Edits
SER SECTIONAL SPEED INCREASES DUE TO MASSIVE ENGINEERING WORKS
South Eastern Railway has undertaken massive Track Renewal and Engineering Works spreading over all its sections. As a result of these track renovation and engineering works, the mobility of trains has been increased considerably. This has been done by reducing permanent speed restriction, expeditious removal of temporary speed restrictions to maintain long restriction free stretches, running of trains with right powering to the extent possible, restriction free stretches 50 Km or more and sectional speed acceleration.
The raising of speed in
...
more...
some important sections i.e. :
Bokaro N cabin-Talgoria section raising from 50 kmph to 60 kmph, Shyamchak –Kharagpur 3rd line from 100 kmph to 110 kmph, Muri to Kotshila from 105 kmph to 110 kmph, Kotshila-Rajabera from 105 kmph to 110 kmph, Chandil-Muri from 95 kmph to 110 kmph, Rajharkharswan-Mahalimarup 3rd line from 100 kmph to 110 kmph, Adityapur-Gamharia 3rd line from 90 kmph to 110 kmph, Posoita-Manoharpur 3rd line from 80 kmph to 110 kmph, Bhojudi –Gomoh from 105 kmph to 110 kmph, Burnpur-Joychandipahar from 100 kmph to 110 kmph, Adra-Bhojudih from 100 kmph to 110 kmph, Muri-Barkakana from 95 kmph to 110 kmph, Pendrasali-Jhinkpani 3rd line 80 kmph to 90 kmph etc. along with some other sections over South Eastern Railway.

As a result the movement of freight trains will be increased without any hurdles achieving reduction of transit time under the jurisdiction of South Eastern Railway. The passenger trains over all sections of South Eastern Railway will also gain speed. The works have also been done in all suburban sections and the train movements in suburban sections will be smoother without any loss of punctuality.
…….

Translate to English
Translate to Hindi

2306 views
1

Mar 20 2018 (18:33)
Dinesh Singh~   1376 blog posts
Re# 3221969-1              
1 compliments
😂😂🤣
NR lucknow, moradbad waale naa jaane kab jaagenge, apni kumbhkarni neend se.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy