Search Forum
Blog Entry# 3244036
Posted: Mar 28 2018 (07:44)
13 Responses
Last Response: Mar 28 2018 (14:11)
13 Responses
Last Response: Mar 28 2018 (14:11)
IR Affairs
NCR/North Central
AdittyaaSharma^~ 69889 news posts
एनसीआर के इलाहाबाद मंडल द्वारा भेजा गया था प्रस्ताव, लिंक के कारण अक्सर लेट आती है ट्रेन
समस्या...
समस्या...
read more... उत्तर रेलवे ने डाला रोड़ा, अलग नहीं होगी संगम-लिंक
8 Posts
Phaphamau To - Unchahar Railway Track will be Doubled. Is there any Plan or Proposal in Place to Double Unchahar - Rai Bareilly Track. If that is done, then the Entire Lucknow - Allahabad Route will be Double Track.
The best route would be hw-mb-be-kasganj-farrukhabad-cpa-cnb-on-ucr-prg
But I think via BE-KSJ-FBD-CNB-ON-UNC-PRG is too long. Better then it would be via HW-MB-LKO-UNC-PRG